During operation, the pressure gauge housing and the meter cover are put together on the upper tooling and positioned according to the shape of the meter cover.
After starting the equipment, the pressing cylinder drives the upper tooling and the bearing to press down. After pressing the meter case, the hydraulic cylinder is started, and the forming mold driven by the cylinder squeezes the specified position.
After reaching the specified position, the equipment automatically returns.
Highlight focuses on the design and manufacturing of pressure testing equipment and fluid control testing systems, supporting both standard models and project-based customization.